BILL NUMBER: AB 1333	INTRODUCED
	BILL TEXT


INTRODUCED BY   Assembly Member Quirk

                        FEBRUARY 27, 2015

   An act to amend Section 399.20 of the Public Utilities Code,
relating to energy.


	LEGISLATIVE COUNSEL'S DIGEST


   AB 1333, as introduced, Quirk. Renewable energy.
   Under the Public Utilities Act, electrical corporations are
required to file with the Public Utilities Commission a standard
tariff for electricity purchased from certain electric generation
facilities. The act declares it is the policy of this state and the
intent of the Legislature to encourage electrical generation from
eligible renewable energy resources.
   This bill would specifically include in those eligible renewable
energy resources those that can be used to meet peak demand. The bill
also would make nonsubstantive changes and would correct erroneous
cross-references.
   Vote: majority. Appropriation: no. Fiscal committee: no.
State-mandated local program: no.


THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:

  SECTION 1.  Section 399.20 of the Public Utilities Code is amended
to read:
   399.20.  (a) It is the policy of this state and the intent of the
Legislature to encourage electrical generation from eligible
renewable energy  resources.   resources,
including renewable energy resources that can be used to meet peak
demand. 
   (b) As used in this section, "electric generation facility" means
an electric generation facility located within the service territory
of, and developed to sell electricity to, an electrical corporation
that meets all of the following criteria:
   (1) Has an effective capacity of not more than three megawatts.
   (2) Is interconnected and operates in parallel with the electrical
transmission and distribution grid.
   (3) Is strategically located and interconnected to the electrical
transmission and distribution grid in a manner that optimizes the
deliverability of electricity generated at the facility to load
centers.
   (4) Is an eligible renewable energy resource.
   (c)  Every   An  electrical corporation
shall file with the commission a standard tariff for electricity
purchased from an electric generation facility. The commission may
modify or adjust the requirements of this section for  any
  an  electrical corporation with less than 100,000
service connections, as individual circumstances merit.
   (d) (1) The tariff shall provide for payment for every
kilowatthour of electricity purchased from an electric generation
facility for a period of 10, 15, or 20 years, as authorized by the
commission. The payment shall be the market price determined by the
commission pursuant to paragraph (2) and shall include all current
and anticipated environmental compliance costs, including, but not
limited to, mitigation of emissions of greenhouse gases and air
pollution offsets associated with the operation of new generating
facilities in the local air pollution control or air quality
management district where the electric generation facility is
located.
   (2) The commission shall establish a methodology to determine the
market price of electricity for terms corresponding to the length of
contracts with an electric generation facility, in consideration of
the following:
   (A) The long-term market price of electricity for fixed price
contracts, determined pursuant to an electrical corporation's general
procurement  activities   activities,  as
authorized by the commission.
   (B) The long-term ownership, operating, and fixed-price fuel costs
associated with fixed-price electricity from new generating
facilities.
   (C) The value of different electricity products including
baseload, peaking, and as-available electricity.
   (3) The commission may adjust the payment rate to reflect the
value of every kilowatthour of electricity generated on a
time-of-delivery basis.
   (4) The commission shall ensure, with respect to rates and
charges, that ratepayers that do not receive service pursuant to the
tariff are indifferent to whether a ratepayer with an electric
generation facility receives service pursuant to the tariff.
   (e) An electrical corporation shall provide expedited
interconnection procedures to an electric generation facility located
on a distribution circuit that generates electricity at a time and
in a manner so as to offset the peak demand on the distribution
circuit, if the electrical corporation determines that the electric
generation facility will not adversely affect the distribution grid.
The commission shall  consider   consider, 
and may  establish   establish,  a value
for an electric generation facility located on a distribution circuit
that generates electricity at a time and in a manner so as to offset
the peak demand on the distribution circuit.
   (f) (1) An electrical corporation shall make the tariff available
to the owner or operator of an electric generation facility within
the service territory of the electrical corporation, upon request, on
a first-come-first-served basis, until the electrical corporation
meets its proportionate share of a statewide cap of 750 megawatts
cumulative rated generation capacity served under this section and
Section  387.6.   399.32.  The
proportionate share shall be calculated based on the ratio of the
electrical corporation's peak demand compared to the total statewide
peak demand.
   (2) By June 1, 2013, the commission shall, in addition to the 750
megawatts identified in paragraph (1), direct the electrical
corporations to collectively procure at least 250 megawatts of
cumulative rated generating capacity from developers of bioenergy
projects that commence operation on or after June 1, 2013. The
commission shall, for each electrical corporation, allocate shares of
the additional 250 megawatts based on the ratio of each electrical
corporation's peak demand compared to the total statewide peak
demand. In implementing this paragraph, the commission shall do all
of the following:
   (A) Allocate the 250 megawatts identified in this paragraph among
the electrical corporations based on the following categories:
   (i) For biogas from wastewater treatment, municipal organic waste
diversion, food processing, and codigestion, 110 megawatts.
   (ii) For dairy and other agricultural bioenergy, 90 megawatts.
   (iii) For bioenergy using byproducts of sustainable forest
management, 50 megawatts. Allocations under this category shall be
determined based on the proportion of bioenergy that sustainable
forest management providers derive from sustainable forest management
in fire threat treatment areas, as designated by the Department of
Forestry and Fire Protection.
   (B) Direct the electrical corporations to develop standard
contract terms and conditions that reflect the operational
characteristics of the projects, and to provide a streamlined
contracting process.
   (C) Coordinate, to the maximum extent feasible, any incentive or
subsidy programs for bioenergy with the agencies listed in
subparagraph (A) of paragraph (3)  in order  to
provide maximum benefits to ratepayers and to ensure that incentives
are used to reduce contract prices.
   (D) The commission shall encourage gas and electrical corporations
to develop and offer programs and services to facilitate development
of in-state biogas for a broad range of purposes.
   (3) (A) The commission, in consultation with the  State
Energy Resources Conservation and Development   Energy
 Commission, the State Air Resources Board, the Department of
Forestry and Fire Protection, the Department of Food and Agriculture,
and the Department of Resources Recycling and Recovery, may review
the allocations of the 250 additional megawatts identified in
paragraph (2) to determine if those allocations are appropriate.
   (B) If the commission finds that the allocations of the 250
additional megawatts identified in paragraph (2) are not appropriate,
the commission may reallocate the 250 megawatts among the categories
established in subparagraph (A) of paragraph (2).
   (4) For  the  purposes of this subdivision,
"bioenergy" means biogas and biomass.
   (g) The electrical corporation may make the terms of the tariff
available to owners and operators of an electric generation facility
in the form of a standard contract subject to commission approval.
   (h) Every kilowatthour of electricity purchased from an electric
generation facility shall count toward meeting the electrical
corporation's renewables portfolio standard annual procurement
targets for purposes of paragraph (1) of subdivision (b) of Section
399.15.
   (i) The physical generating capacity of an electric generation
facility shall count toward the electrical corporation's resource
adequacy requirement for purposes of Section 380.
   (j) (1) The commission shall establish performance standards for
any electric generation facility that has a capacity greater than one
megawatt to ensure that those facilities are constructed, operated,
and maintained to generate the expected annual net production of
electricity and do not impact system reliability.
   (2) The commission may reduce the three megawatt capacity
limitation of paragraph (1) of subdivision (b) if the commission
finds that a reduced capacity limitation is necessary to maintain
system reliability within that electrical corporation's service
territory.
   (k) (1)  Any   An    owner or
operator of an electric generation facility that received
ratepayer-funded incentives in accordance with Section 379.6 of this
code, or with Section 25782 of the Public Resources Code, and
participated in a net metering program pursuant to Sections 
2827, 2827.9,   2827  and 2827.10  of
  of, and former Section 2827.9 of,  this code
 prior to   before  January 1, 2010, shall
be eligible for a tariff or standard contract filed by an electrical
corporation pursuant to this section.
   (2) In establishing the tariffs or standard contracts pursuant to
this section, the commission shall consider ratepayer-funded
incentive payments previously received by the generation facility
pursuant to Section 379.6 of this code or Section 25782 of the Public
Resources Code. The commission shall require reimbursement of any
funds received from these incentive programs to an electric
generation facility, in order for that facility to be eligible for a
tariff or standard contract filed by an electrical corporation
pursuant to this section, unless the commission determines ratepayers
have received sufficient value from the incentives provided to the
facility based on how long the project has been in operation and the
amount of renewable electricity previously generated by the facility.

   (3) A customer that receives service under a tariff or contract
approved by the commission pursuant to this section is not eligible
to participate in  any   a  net metering
program.
   (l) An owner or operator of an electric generation facility
electing to receive service under a tariff or contract approved by
the commission shall continue to receive service under the tariff or
contract until either of the following occurs:
   (1) The owner or operator of an electric generation facility no
longer meets the eligibility requirements for receiving service
pursuant to the tariff or contract.
   (2) The period of service established by the commission pursuant
to subdivision (d) is completed.
   (m) Within 10 days of receipt of a request for a tariff pursuant
to this section from an owner or operator of an electric generation
facility, the electrical corporation that receives the request shall
post a copy of the request on its Internet Web site. The information
posted on the Internet Web site shall include the name of the city in
which the facility is located, but information that is proprietary
and confidential, including, but not limited to, address information
beyond the name of the city in which the facility is located, shall
be redacted.
   (n) An electrical corporation may deny a tariff request pursuant
to this section if the electrical corporation makes any of the
following findings:
   (1) The electric generation facility does not meet the
requirements of this section.
   (2) The transmission or distribution grid that would serve as the
point of interconnection is inadequate.
   (3) The electric generation facility does not meet all applicable
state and local laws and building standards and utility
interconnection requirements.
   (4) The aggregate of all electric generating facilities on a
distribution circuit would adversely impact utility operation and
load restoration efforts of the distribution system.
   (o) Upon receiving a notice of denial from an electrical
corporation, the owner or operator of the electric generation
facility denied a tariff pursuant to this section shall have the
right to appeal that decision to the commission.
   (p)  In order to   To    ensure
the safety and reliability of electric generation facilities, the
owner of an electric generation facility receiving a tariff pursuant
to this section shall provide an inspection and maintenance report to
the electrical corporation at least once every other year. The
inspection and maintenance report shall be prepared at the owner's or
operator's expense by a California-licensed contractor who is not
the owner or operator of the electric generation facility. A
California-licensed electrician shall perform the inspection of the
electrical portion of the generation facility.
   (q) The contract between the electric generation facility
receiving the tariff and the electrical corporation shall contain
provisions that ensure that construction of the electric generating
facility complies with all applicable state and local laws and
building standards, and utility interconnection requirements.
   (r) (1) All construction and installation of facilities of the
electrical corporation, including at the point of the output meter or
at the transmission or distribution grid, shall be performed only by
that electrical corporation.
   (2) All interconnection facilities installed on the electrical
corporation's side of the transfer point for electricity between the
electrical corporation and the electrical conductors of the electric
generation facility shall be owned, operated, and maintained only by
the electrical corporation. The ownership, installation, operation,
reading, and testing of revenue metering equipment for electric
generating facilities shall only be performed by the electrical
corporation.